★SNIEC will send staffs to booths to ensure booth facilities are completely and properly installed. If the number of correctly connected booths in the current exhibition hall reaches more than 50% of the total, SNIEC will provide the power normally by 10:00a.m, March 19, 2024. For special cases, applications for early power supply, please contact MEGA EXPO or refer to Form 5 (Electrical Setting) for details.
★Exhibitor who contracted Raw Space in SEMICON China 2024 are subjected to a Hall Management Fee (RMB 23/sqm) per rules published by SNIEC. All raw space exhibitors are required to pay the Hall Management Fee to official contractor. MEGA EXPO before February 8th, 2024.
★The maximum height for N1-N5, E7 raw space stand structure is 4.4 meters, and for T0-T3 raw space stand structure is 4 meters, two-story booths are not permitted in Hall T.
SEMICON China 2024 Safety Measurament
★All raw space exhibitor's contractor must submit the contractor's license. The electrician must has the electrician certificate and the copied documents should be the same as the electrician operating on the show site.
★All raw space exhibitors must assign a full-time employee to be the safety construction manager to coordinate safety construction and monitor the entire working process. Please finish and return the Form 3 (Safety Construction Manager Registration Form).
★Exhibitors who rent raw space can appoint their own contractors to set up the booth. Please ensure you and your contractor read and observe all the rules & regulations in the 《Safety Construction Guideline》. For details please refer to EAC Inspection & Move-in Process or Section 5 in Exhibitor Service Manual.
★Back Wall Construction Guideline for Raw Booth
All raw booths, except island configurations, must provide a full back wall, minimum of 2.4 meters (8”) in height. All exposed walls must be finished on all sides at the expense of the exhibitor who owns the walls. All exposed wall areas or exposed structures must be covered by white PVC cloth without any break, contamination, graphics or texts. If the back wall did not meet the above requirements, penalty will be deducted from the construction deposit. ★During the exbition, Non degradable plastic bags is forbidden onsite.
|