If you have trouble viewing this mail, please click here for the html version.

参展商快讯

January 2021 www.fpdchina.org
中文版请点击这里


Your FPD China Team

Should you have further questions, please contact a FPD China team member listed below.

Exhibiting & Sponsorship


Ms. Eileen Xiao
Tel: +86.21.6027.8525
Email: [email protected]

Show Preparation
(Booth Construction, Freight Handling, Exhibitors Registration, etc)

Mr. Azir Xiang
Tel: +86.21.6027.8536
Email: [email protected]

Mr. Ryan Cai
Tel: +86.21.6027.8520
Email: [email protected]

Technical Programs

Ms. Eileen Xiao
Tel: +86.21.6027.8525
Email: [email protected]

FPD China 2021 Upates

Please be sure to sign and seal the Commitment letter of responsibility for epidemic prevention and control of exhibitors (Click to Download) before February 10th and send it to the following mailbox: [email protected]
If you do not sign and seal the Commitment letter of responsibility for epidemic prevention and control of exhibitors and send it bcak, the organizer have the right to refuse the exhibitors’ access to the exhibition area, and all consequences arising therefrom shall be borne by the exhibitors.

Transportation Vehicles

Parking Permit” and “Queueing Number” must be obtained before driving vehicles into the loading areas to load and unload the goods. Security staffs are authorized to stop those who fail to follow the guidance from entering. For detail information, you can refer to “Queueing Number & Parking Permit Notice”

★In order to practice related requirement from fire bureau about further strengthening temporary power management, improve the expos fire safety work, eliminate potential safety hazards, prevent fire safety accident, SNIEC will push forward the using of distribution box with monitoring function since 1st March 2021. For details please contact Official Decorator- Mega Expo, Tel: +86.21.5445.3125.

★SNIEC will send staffs to booths to ensure booth facilities are completely and properly installed. After inspection, SNIEC will provide the power normally by 12:00pm, Mar 16, 2021. For special cases, applications for early power supply, please contact MEGA EXPO or refer to Form 5 (Electrical Setting) for details.

Exhibitor who contracted Raw Space in FPD China 2021 are subjected to a Hall Management Fee (RMB 22/sqm) per rules published by SNIEC. All raw space exhibitors are required to pay the Hall Management Fee to official contractor. MEGA EXPO before February 10th, 2021.

The maximum height for N1-N5, E7 raw space stand structure is 4.4 meters, and for T1-T3 raw space stand structure is 4 meters.

FPD China 2021 Safety Measurament

-All raw space exhibitor's contractor must submit the contractor's license. The electrician must has the electrician certificate and the copied documents should be the same as the electrician operating on the show site.


-All raw space exhibitors must assign a full-time employee to be the safety construction manager to coordinate safety construction and monitor the entire working process. Please finish and return the Form 3 (Safety Construction Manager Registration Form).

-Exhibitors who rent raw space can appoint their own contractors to set up the booth. Please ensure you and your contractor read and observe all the rules & regulations in the 《Safety Construction Guideline》. For details please refer to EAC Inspection & Move-in Process or Section 5 in Exhibitor Service Manual.

Download Center
> Exhibitor Services Manual
  The manual will provide you with everything you need for a successful exhibition. Please take time to download and read through it, ensuring that the necessary actions are taken and the service forms are returned as required by their respective deadlines.
> FPD China 2021 FLOORPLAN
  We encourage you to bookmark the FLOORPLAN so you can view it conveniently throughout the show cycle.
This Month

Exhibitor Password
Your Company name is: [[CompanyName]]
Your password is: [[Password]]
Use your password to:
-Log-in the Online Exhibitor Administrative Site to submit your company profile and products information. The earlier you submit your information, the more exposure opportunities you will have to the potential clients.

-Log-in the Online Exhibitor Service Center to register your company's Exhibiting Personnel before Mar 5, 2021. One person, one badge.

Exhibit Prepration
About the exhibit prepration of N1-N5、E7, please read SEMICON/FPD China 2021 Move-in/Move-out Notice
About the exhibit prepration of T1-T3,please read SEMICON/FPD China 2021 T1-T3 notes.Please read Exhibitors Notice, SEMI China committee never recommend or appoint any company as appointed contractor for raw space. Please improve your safety awareness and keep yourself away from false information.

Hotel Reservaon
It will be better for you to reserve hotel as soon as possible because of the hotel peak-season during FPD China 2021. SEMI, working with our service partner Shanghai Vision Expo & Meeting Solutions Co., Ltd. has negotiated with several hotels to provide you favorable price. Please download Hotel Reservation Form or make your Reservation Online to book your room before Feb. 10, 2021.

Back Wall Construction Guideline for Raw Booth
All raw booths, except island configurations, must provide a full back wall, minimum of 2.4 meters (8”) in height. All exposed walls must be finished on all sides at the expense of the exhibitor who owns the walls. All exposed wall areas or exposed structures must be covered by white PVC cloth without any break, contamination, graphics or texts. If the back wall did not meet the above requirements, penalty will be deducted from the construction deposit.

Recent Deadline
Deadline: Jan.22, 2021.
EAC Application with booth drawing
Deadline: Feb.10, 2021.
Name Fascia
EAC Application with booth drawing:
Safety Construction Manager Registration Form
Furniture,Lighting & Socket Rental
Electrical Setting
Water and Compressed Air
Telephone and Internet

Location Plan
Upgraded Package Booth
Building Approval
Hotel Reservation Form
Lead Retrieval System Order Form
Meeting Room Reservation
Request Form for an Invitation to PRC.

Deadline: Mar.5, 2021.
Lead Retrieval System Order Form

Exhibitor Update in previous months
Octorber Issue November Issue December Issue